Raw Water Pump Station 2023
Click the months below to filter through construction photos
October

Paving at the Raw Water Pump Station

Building up Aldrich Road to Prepare for Paving
September

Valley Gutter in Road
August

Outfall Structure
July

Process pipe coating
June

Skylight at Raw Water Pump Station
May

skylights installation

Formwork for cast in place concrete

Raw Water Pump Station AC Enclosure



April

Block Enclosure for Generator

Raw Water Piping
March

Finishing Work at Raw Water Outfall Structure in TID Canal

Bridge Crane Installed for Heavy Lifting at RWPS

Future Generator Pads under Construction



February

Close Up Bridge Crane at RWPS

Bridge Crane at RWPS

Formwork at RWPS

Concrete Formwork and Rebar for Pump Can at RWPS

Pipe Supports Transmission Main RWPS

Pump Can Formed Up Rebar in Place RWPS

Sheetrock installation at the Raw Water Pump Station

Sheetrock installation at the Raw Water Pump Station








January

sheet rock installation Maintenance Bldg

Roof framing at the Raw Water Pump Station continues.