October

Paving Berkeley road.

Prep work for paving on Berkeley.

42”Turlock FWTM Between Service and Sante fe on Berkeley.



September

Pipe along Berkeley Road

The contractor is placing concrete for a maintenance hole at the corner of Service and Berkeley.
August

Aggregate base is currently being placed on Berkeley Road north of Whitmore Road.

The Contractor is continuing excavating and laying 42” steel pipe down Berkeley Rd

Pipeline installation is underway for the Turlock Finished Water Transmission Main

The contractor laying 42” steel pipe down Aldrich Rd towards Fox Rd




July

Pipeline installation is underway for the Turlock Finished Water Transmission Main

42 inch pipe is being staged along Aldrich Road
June