Wet Well

Roadway from Fox Grove Parking Area Constructed

Construction Trailers have been Set-up

Site Benching/Excavation

Initial Site Benching Activities have Occurred

About 8 feet of Material Removed

Site Excavation; Benching Activities form Elevation 78 ft to 72 ft

Use of Sonic Drilling Rig to Confirm Location of Clay Layer

Surveyed Location of Infiltration Gallery Piping

Borehole Drilling for Freeze Pipe Installation

90 Foot Long Freeze Pipes Ready for Installation

Freeze Pipe being Installed in Borehole by Crane

Freeze Pipe Installation

Install Pipe Installation

Finished Construction Site

Finished Construction Site

Finished Construction Site

Finished Construction Site

Finished Construction Site

Finished Construction Site

Finished Construction Site

Finished Construction Site

Finished Construction Site